<?xml version="1.0" encoding="utf-8" standalone="yes"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Blog on Matterize Labs</title><link>https://matterizelabs.com/blog/</link><description>Recent content in Blog on Matterize Labs</description><generator>Hugo</generator><language>en-us</language><lastBuildDate>Wed, 15 Jul 2026 00:00:00 +0000</lastBuildDate><atom:link href="https://matterizelabs.com/blog/index.xml" rel="self" type="application/rss+xml"/><item><title>DAC and PKI in Matter: What every hardware founder needs to know</title><link>https://matterizelabs.com/blog/post-dac-pki-matter/</link><pubDate>Wed, 15 Jul 2026 00:00:00 +0000</pubDate><guid>https://matterizelabs.com/blog/post-dac-pki-matter/</guid><description>Device Attestation Certificates and Public Key Infrastructure are the two most-misunderstood parts of Matter certification. Here&amp;rsquo;s what they are, why they matter, and how to get them right.</description></item><item><title>End-of-Line Testing for Matter Devices</title><link>https://matterizelabs.com/blog/end-of-line-testing-matter/</link><pubDate>Thu, 09 Jul 2026 00:00:00 +0000</pubDate><guid>https://matterizelabs.com/blog/end-of-line-testing-matter/</guid><description>Commissioning loops, RF calibration, DAC chain validation, and OTA testing — the production test strategy that catches certification failures before the lab does.</description></item><item><title>DAC Provisioning Pipeline: The PKI Chain That Kills Production</title><link>https://matterizelabs.com/blog/dac-provisioning-pipeline/</link><pubDate>Tue, 07 Jul 2026 00:00:00 +0000</pubDate><guid>https://matterizelabs.com/blog/dac-provisioning-pipeline/</guid><description>PAA, PAI, CD, DAC — the certificate chain every Matter device needs, the provisioning steps that must happen at the factory, and the misconfigurations that scrap entire production runs.</description></item><item><title>Factory Flashing at Scale: Tooling and Throughput</title><link>https://matterizelabs.com/blog/factory-flashing-at-scale/</link><pubDate>Sun, 05 Jul 2026 00:00:00 +0000</pubDate><guid>https://matterizelabs.com/blog/factory-flashing-at-scale/</guid><description>Gang programmers, pogo-pin jigs, and post-flash verification — what separates prototype flashing from production-ready provisioning for Matter devices.</description></item><item><title>Provisioning Matter Devices at Scale: What Kills Production Runs</title><link>https://matterizelabs.com/blog/provisioning-matter-devices-at-scale/</link><pubDate>Fri, 03 Jul 2026 00:00:00 +0000</pubDate><guid>https://matterizelabs.com/blog/provisioning-matter-devices-at-scale/</guid><description>Factory flashing, DAC provisioning, and production line realities that separate engineering prototypes from shippable Matter products.</description></item></channel></rss>